Oil Search reported that DST#4 over the Qishn S2 Sandstones in the Nabrajah-2 well flowed oil at 1,427 barrels per day with minimal gas and no water production.
The Qishn S2 sandstone was re-tested due to excessive water production during DST#2 and DST#3, which was related to poor cement isolation from deeper water-bearing Lower Qishn sandstones.
Oil Search said the well was suspended and the rig released on 9 October. The rig is currently being mobilised to the Nabrajah-1 surface location from where the Nabrajah-3 appraisal well will be drilled, with a bottom hole location 1.1 kilometres north east of the Nabrajah-1 bottom hole location.