OIL

Nido begins workover of Tindalo sidetrack

NIDO Petroleum has begun workover operations on the Tindalo-1ST1 in the offshore Palawan Basin, Philippines, to prevent the influx of water into the well.

Nido begins workover of Tindalo sidetrack

Last month the company said it would plan a workover of the well after data indicated that mechanical failure had resulted in early water influx in the well. The workover includes removing the existing...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry