On production the Hutton zone is estimated to be capable of producing more than 1000 barrels of oil per day, according to Stuart.
The well has reached total depth of 1538 metres and wireline logs have been completed.
The McKinlay formation was also intersected as prognosed and oil will be produced from it at a later date. In addition, drillstem test one will be conducted over the interval 1207-1223 metres in the Murta formation to test log anomalies which were also present in Derrilyn-1 but not tested.
Participants in Derrilyn-2 are Santos Limited (Operator) 65% (STO) and Stuart Petroleum Limited 35% (STU).