OIL

Major EPC Spar contract for CSO Aker Maritime in the GoM

Houston-based CSO Aker Maritime has been awarded a major engineering, procurement and constructio...

It will also be responsible for the mooring and riser system.

The hull, which will be built in Finland, will be about 170 metres tall, with a diameter of about 30m, displace 38,000 metric tonnes and weigh approximately 14,000 tonnes.

The Gunnison Field is located in the Gulf of Mexico about 250km southeast of Galveston, Texas in 950m of water. The field is operated by Kerr-McGee Oil & Gas Corp, a wholly-owned subsidiary of Kerr-McGee Corp and will be the company's third Truss Spar.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

Energy News Bulletin Future of Energy Report 2024

With the global energy market in constant development, this report captures the sentiment of key industry players on the future of energy in Australia – and how it has changed through 2024.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.