The well also flowed 7033 barrels of water during the comingled test.
“Electric logging post the Qishn S2 Sandstone test has confirmed that the high water production associated with the produced oil came from the deeper Lower Qishn”, said the report.
Oil Search said currently the well is being prepared for DST #4 over the interval 1,933 -1,935 metres.
Interests are DNO ASA 56.67% (operator), Oil Search (Yemen) Limited 28.33%, The Yemen Company 15%.