PREMIUM FEATURES

Waitsia Stage 1A reaches FID

AWE and Origin Energy (50/50) have made final investment decision for Stage 1A of the Waitsia gas field project in Western Australia's onshore Perth Basin which could be part of the solution to the state's pending gas supply crisis that Wood Mackenzie has forecast to hit by 2021.

Waitsia Stage 1A reaches FID

The decision on the 484 billion cubic feet (gross) Waitsia gas project will allow new infrastructure to be installed and the upgrading of existing assets that will connect the recently flow-tested Waitsia-1...

Start a free trial to continue reading this article

Already have an account?

Subscribe now
MORE ON THIS TOPIC

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry