OPERATIONS

Byron successfully installs SM58 platform

BYRON Energy is celebrating the successful installation of the platform at its South Marsh Island 58 production well, in the Gulf of Mexico, and is making final preparations for the drilling rig’s arrival.

Byron successfully installs SM58 platform

The Gulf of Mexico operator told the market it had reinstalled the jacket and decks from its SM71 G platform onto the SM58 well. It said by salvaging and refurbishing the structure which was already...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry