OPERATIONS

Zenith finishes construction of gas power at gold mine

Trucked LNG supplying gas-fired gen for Kirkalocka

 kirkalocka-gold-mine.jpg

kirkalocka-gold-mine.jpg

  Supply began September 15 and a full month of power production achieved in October The terms of PPA are that Zenith build, own and operate the station, made up of a 9.9MW gas-fired power a 4.6MW...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry