OPERATIONS

Metgasco hard at work in Clarence-Moreton

METGASCO has been keeping busy in the Clarence-Moreton Basin with clean-up operations continuing on the Kingfisher EO1 well, the 2010 2D seismic survey completed and further drilling being carried out.

Metgasco hard at work in Clarence-Moreton

The company said it had made progress in removing liquid introduced during the stimulation treatment of the Kingfisher EO1 well with about 85% of the fluid removed so far. Kingfisher EO1 is producing...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry