OPERATIONS

Big flows at Callawonga-2

THE Callawonga-2 appraisal-development well, in Cooper Basin permit PEL 92, has flowed almost 500...

Beach said it was tying the well into the Callawonga oil field facilities, with production expected to start from next month.

After completing the Callawonga-2 for production, the rig will move to the north to drill the Callawonga-3 appraisal-development well.

Callawonga-1, which started production last November, was one of two 2006 oil discoveries during 2006 in PEL 92, in which Beach holds a 75% stake and Cooper holds 25%. The other is Silver Sands, found in May last year.

The PEL 92 partners are operator Beach Petroleum (75%) and Cooper Energy (25%).

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

Energy News Bulletin Future of Energy Report 2024

With the global energy market in constant development, this report captures the sentiment of key industry players on the future of energy in Australia – and how it has changed through 2024.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.