Drill stem test 2 over 2364-2371m in the Paning Member recovered two barrels of oil and 103 barrels of water in the drill string following a flow period of five hours.
“The significance of this result and other hydrocarbon shows encountered will be fully evaluated post logs,” Stuart said.
Participants in Baystone are Stuart 75% and Beach Petroleum 25%.