LNG (LIQUIFIED NATURAL GAS)

Leighton consortium extends Gorgon deal, J Ray wins fabrication job

LEIGHTON Contractors and Saipem have been awarded an additional $150 million variation on top of their existing contract to build the liquefied natural gas jetty and marine structures for the Gorgon LNG project.

Leighton consortium extends Gorgon deal, J Ray wins fabrication job

The variation calls for the design, fabrication and installation of pre-assembled racks for the 2.1-kilometre LNG jetty, bringing their total project value up to just over $1 billion. The PAR design,...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry