EXPLORATION

Santos makes multiple hits in the Patchawarra

SANTOS announced this morning it had successfully completed its Moomba South phase 1 program as it plans for more east coast gas, with seven out of eight fracced wells yielding liquids-heavy gas as part of the oiler’s plans to move contingent resources to reserves. 

Santos MD Kevin Gallagher pleased by phase 1 of Cooper campaign

Santos MD Kevin Gallagher pleased by phase 1 of Cooper campaign

It shares PPL8 and PPL 9 with Beach Energy in a 66%-34% split with Santos as operator.    All eight wells in phase 1 intersected gas-bearing reservoirs in the Patchawarra sandstone and individual stabilised...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry