EXPLORATION

Work exceeds permit expectations offshore Taranaki

A PROGRAM designed to gather about 400km2 of new 3D seismic within and adjacent to the PEP 51906 ...

Work exceeds permit expectations offshore Taranaki

The Polarcus Alima survey vessel is on location and running an array of 10 cables, each 8km long and spaced 100m apart, in a survey expected to take 23 days. The survey area is on the northeast structural...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry