EXPLORATION

Empire laying out plans to test Gingin West-1

EMPIRE Oil & Gas plans to carry out two cased hole tests through tubing at its Gingin West-1 well in the Perth Basin after wireline logging detailed the interpreted hydrocarbon-bearing intervals.

The first test targets the 3760m D Sand where hydrocarbon saturations were detected on the logs with modest gas shows in the well. The equivalent sand in the Bootine-1 well had flowed 2.2 million cubic...

Start a free trial to continue reading this article

Already have an account?

Subscribe now
MORE ON THIS TOPIC

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry