EXPLORATION

Poseidon testing due soon

CONOCOPHILLIPS and Karoon Gas are preparing to carry out drill stem testing of their Poseidon-2 a...

Poseidon testing due soon

Karoon said the production liner had been run and cemented at 5350m. Poseidon-2 was drilled to a total depth of 5356m by the Transocean Legend semi-submersible drilling rig to test the extent, presence...

Start a free trial to continue reading this article

Already have an account?

Subscribe now
MORE ON THIS TOPIC

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry