The Perth-based junior said today that operator CNPC International Mauritania (CNPCIM) was drilling ahead at a depth of 2024m in 12¼-inch hole.
The well has encountered fluorescence over a gross interval from 1811-1875m and gas shows over a gross interval from 1857-1875m in interbedded sandstones and shales.
Baraka said the shallowest objective for Heron-1 is at about 2200m in Cenomanian sandstones and a deeper objective is at about 3600m in Aptian sandstones and limestone.
It is expected to take about three months to drill Heron-1 to a total planned depth of 3800m.
The land-based drilling campaign is the first in the country in recent years.
Following Heron-1, CNPCIM will use the rig to drill an exploration well in neighbouring Coastal Block 12, in which Baraka does not have an interest.
Interests in Heron are CNPC (65%) and Baraka (35%).