Spaced between 936m depth and 1208m the shows averaged 25% porosity with the gas sands correlating with those encountered at Adatepe-1.
The Adatepe-2 well is a development well located approximately 6km southeast of the Gocerler Gas Field and 438m southeast of Adatepe-1 well.
The Adatepe structure is a faulted anticlinal closure located on a northwest-southeast trending fault bound horst in an area coincident with strong amplitudes on the 3D seismic data. The closest wells to Adatepe-2 are Adatepe-1, Gocerler-3, 4 and 5 and Bahcedere-1.
Gocerler-3 was drilled in March 2002 and achieved a record gas flow for Turkey (32 mmcfd).
Adatepe-2 well will test the hydrocarbon and reservoir potential of the Danismen sands to appraise the production potential and extent of the Adatepe Field.
The well is interpreted to have the same structure elevation as Adatepe-1 at the key gas sand horizon.
Amity and Turkiye Petrolleri AO (TPAO) each hold a 50% interest in the JV.