This article is 21 years old. Images might not display.
Patties Pies South was a follow-up well to Patties Pies No. 1 and is being drilled to assess a structure to the south of a bore hole which has been producing gas with water to the surface for some time.
BNP and Golden Gate were also forced to P&A the Jack Frost-1 well. Although electric logs had indicated a potential gross gas pay of around 24 ft, testing achieved a flow of water with only minor gas quantities. Final analysis revealed that the reservoir was water saturated and only residual gas remains.