EUROPE

Communication is key

ABB Group will install internal and external telecommunication systems on three Statoil projects ...

Communication is key

The company signed contracts with shipyards in South Korea that are building offshore installations for the Aasta Hansteen, Gina Krog and Mariner fields.

Mariner and Gina Krog will host fixed, steel-jacket platforms, with the topsides to be constructed at the Daewoo Shipbuilding and Marine Engineering yard, while Aasta Hansteen will boast a single-cylinder Spar platform, with the topside module constructed at Hyundai Heavy Industries.

The telecommunication systems installed by ABB will be tailored to Statoil's requirements concerning design and documentation. They could include things as wide ranging as computer networks, surveillance equipment, radio systems, meteorological services, radar systems, aeronautical navigation and communication-based safety systems.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry