The two-year agreement gives Leighton exclusive rights to work with EnviroMission to determine viability of the tower.
EnviroMission holds an exclusive licence for German technology designed to generate enough electricity to power 200,000 homes.
The system is designed so that rising hot air in a kilometre-high tower turns electricity generating turbines.