DRILLING

Carbon confidence

CARBON Energy now knows that the cavity it drilled for the Bloodwood Creek underground coal gasif...

Carbon confidence

The cavity was drilled to power up Panel 2 at the site, which operated continuously for 20 months and gasified about 13,000 tonnes of coal, creating a cavity of 8500 cubic metres. Aquatronic Solutions...

Start a free trial to continue reading this article

Already have an account?

Subscribe now
MORE ON THIS TOPIC

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry