DRILLING

Senex gets the rig

SENEX Energy has secured the 1125 kilowatt Weatherford Rig 826 for the next two wells in a 12-well campaign in PEL 516 and PEL 115.

Senex gets the rig

It will drill both Skipton-1 in PEL 516 and Kingston Rule-1 in PEL 115 wells down to a total depth of roughly 3000m to target the Roseneath-Epsilon-Murtee package of shale and tight gas while also tapping...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry