DRILLING

VicPet spuds another Cooper well

A VICTORIA Petroleum joint venture yesterday started drilling Stormbird-1, the last well in the c...

VicPet spuds another Cooper well

Operator VicPet said the well was spudded on Monday and at 6am on Tuesday, the well was drilling ahead at 391m. Stormbird-1 is expected to take 15 days to drill to a total depth of 2280m and is targeting...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry