DRILLING

Mutineer-13 unlucky for Santos

SANTOS has reported a disappointing start to work at its Mutineer oil field, offshore north-weste...

Mutineer-13 unlucky for Santos

The Mutineer-13 appraisal well was plugged and abandoned after the primary objective was intersected low to prognosis and found to be water saturated at this location.

The well was drilled about 1.8km west-south-west of Mutineer-3, in an attempt to test a possible extension of the field.

With drilling completed, the Songa Mercur drilling rig will move to work-over the Mutineer-Exeter production result.

Further drilling around the Mutineer-Exeter fields is planned for the second quarter of 2008, with several appraisal and near-field exploration wells under consideration.

Santos said the Mutineer-13 result would not impact its proven and probable (2P) oil reserves for the two fields, but would remove some of the possible (3P) reserve and production upside attributed to this well location.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry