DRILLING

Ensign rig ready for Flax drilling: Innamincka

NOW the weather has cleared up, Innamincka Petroleum says the Ensign Rig 30 rig has arrived at it...

This article is 17 years old. Images might not display.

Drilling is expected to take 18 days, after which the rig will drill the Flax-4 and Flax East-1 wells.

At the beginning of last year, an independent team determined Flax had the potential to contain 3.2 million barrels of mean oil reserves.

PEL 103 is Innamincka's main oil and gas permit, in which it now holds a 75% interest.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

Future of Energy Report: Nuclear Power in Australia 2024

Energy News Bulletin’s new report examines what the energy and resources industry thinks of the idea of a nuclear-powered Australia.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.