DRILLING

Third duster for HJV

THE Harriet Joint Venture has continued its recent run of bad luck with news that its Priam-1 exp...

Third duster for HJV

This is the third dry deviated well the HJV has drilled this month, following successive failures at Agamemnon-1 and Hector-1.

Junior partner Tap Oil told the Australian Stock Exchange yesterday that the Ensco-67 rig is now moving to drill the HJV’s next well, West Cycad-1, also in the offshore Carnarvon Basin.

While Priam-1 did not intersect any hydrocarbons in the target Double Island Sandstone, the well did encounter oil in the shallower oil reservoir of the Agincourt field.

But Tap said Priam-1 was not required to be a producer, as the majority of oil from this reservoir was expected to be drained from existing wells.

Priam-1 was drilled as a deviated well to a total depth of 1868m, about 1.5km northeast of the surface location.

HJV participants comprise Apache Northwest (operator with a 68.5% stake), Tap (Harriet) (12.2229%) and Kufpec Australia (19.2771%).

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry