DRILLING

Luton-2 keeps the sun shining

Sunshine Gas has enjoyed early success at its Luton-2 coal bed methane (CBM) well in the Bowen Ba...

Luton-2 keeps the sun shining

The company encountered gas charged sands lying immediately above the target coal seam, which will be evaluated on wire-line logs upon completion of the well, although the discovery has already enhanced the economic viability of any future development.

Luton-2 is the third well of a six well program in the Northern Bowen Basin for Sunshine Gas, targeting the Bandanna and Mantuan coals that were intersected by Luton-1.

In Luton-1, the uppermost Bandanna coal seam at 155m produced a 230 unit gas peak and the main Mantuan coal seam, 7m thick at 514m, produced up to 2,500 units of gas. A deeper conventional gas objective will be tested at another time.

Sunshine Gas said the target coal seams in the Luton Prospect region are laterally extensive meaning any success could potentially yield substantial volumes of gas.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry