Bambra -6 is being drilled from the Harriet Bravo Platform and is designed to connect up with the Bambra-5H resulting in one combined well path (instead of a sea floor pipeline) connecting the Bambra Field with the Harriet gathering facilities.
It is expected that the well will be brought into production from the Bravo Platform by mid November.
Partners are Apache Energy (68.5%) Kufpec Australia (19.3%) and Tap Oil (12.2%)