Amity said a 28 metre gross gas column was indicated between 1268 and 1296 metres, with 18m of net gas pay in good reservoir sandstone. A second gas zone was interpreted between 1252 and 1256m.
Amity said both zones correlate with the producing Gocerler-1 and Gocerler-3 wells and so Gocerler-4 will be completed for production and tied into the gas processing plant.
Amity operates the Thrace Joint Venture on behalf of Turkiye Petrolleri AO (50%) and Amity Oil (50%).