DRILLING

Woodside / BHP spud Skiddaw

Woodside and BHP have spudded the deepwater Skiddaw-1 well in WA-255P in the Exmouth sub-basin, n...

Woodside / BHP spud Skiddaw

The well is in 780 metres of water and being drilled by the Atwood Falcon Semi submersible drill rig.

Proposed total depth is 2200 metres.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry