DRILLING

Shakespeare-1 wildcat P&A

Woodside Petroleum (70%) and partner AGIP Australia BV (30%) have reported that their first explo...

This article is 21 years old. Images might not display.

Woodside, operator of the NT/P57 Southern Bonaparte Joint Venture, said the decision to P&A the wildcat well was made after completion of wireline logging.

The Sedco 703 drill rig has left the Shakespeare-1 location and is currently drilling Weasel-1 in WA-279P.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

Future of Energy Report: Nuclear Power in Australia 2024

Energy News Bulletin’s new report examines what the energy and resources industry thinks of the idea of a nuclear-powered Australia.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.