DRILLING

Guilford-1 promising for Woodside

Woodside Petroleum has reported a stand alone, gross 25 metre gas column in its Guilford-1 explor...

Woodside said it is currently acquiring wire-line logs and that preliminary interpretation of the data indicates a gross gas column of 25 metres has been intersected.

The well, located about 75km north west of the North Rankin A platform in WA-269P, has been drilled to total depth and the company says mapping indicates it to be independent of other gas accumulations in the region.

The well was spudded on the 17th of April and was drilled with an 8-1/2 inch hole after setting a 9-5/8 inch casing.

Partners are Woodside (80%) and Japan Australia LNG (MIMI) (20%).

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry