DRILLING

Toobada-1 next in line for Harriet

The Toobada-1 exploration well has been spudded by the Harriet JV in WA-192-P, 15km north of the ...

Toobada-1 next in line for Harriet

Toobada-1 is designed to test a low relief four-way dip closure at the Flag Sandstone level with the potential to contain 20mmbbls of oil if successful. The well is expected to take 11 days to reach the proposed total depth of 3,077m measured depth.

The JV has capitalised on its highly successful spring drilling program with production already underway from the Hoover and North Pedirka oil fields.

Both of those wells are located about 8km south of Varanus Island - North Pedirka-1 in TL/7 and Hoover-2 in TL/6 - and were drilled from the existing Victoria Production Platform which hosts the Victoria-1, Little Sandy-1 and Pedirka-1 oil wells.

Harriet Joint Venture Participants are Tap Oil (operator) 12.2229%, Apache Energy 68.5% and Kufpec Australia 19.2771%.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry