The 2700 metre well will take around 16 days to reach the planned total depth, and has a potential highside recoverable reserve of 1.2mmbo (potential mean of 600,000 bbls) in the Hutton Sandstone and Patchawarra Formation.
Beach (40%) is operating PEL-91 on behalf of Great Artesian (60%).