CSG

Westralian Gas & Power to perforate seam at CBM well

WESTRALIAN Gas & Power has announced that drilling of the Adina-5 coalbed methane well in Yelvert...

The company said perforation of the target coal seam – the Chapman Hill seam – will occur tomorrow, now that the casing and cementing was complete.

At about four metres thick, the Chapman Hill seam is below the Osmington coal seam in Adina-1. Re-perforation of the Osmington seam will take place directly after the work at Adina-5.

The drill rig is now moving to the Adina-3 well location, which has a total target depth of 350 metres, and the surface casing set to 50 metres.

Westralian said seismic data indicated the Adina-3 well would encounter more Permian coals than recovered from the previous two wells.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry