AUSTRALIA

Gorgon lumbers to the finish line

CHEVRON Corporation has confirmed that is has powered up the subsea Jansz-Io field equipment as the Gorgon LNG project moves towards first gas.

Gorgon lumbers to the finish line

The assets, located under 1350m of water on the ocean floor, have been powered up and control system verification testing is underway to ensure there are no issues with opening the Gorgon wells and transporting...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry