AUSTRALIA

Module construction milestone for Bechtel

BECHTEL has finished construction of 260 massive prefabricated steel modules set to comprise three liquefied natural gas plants the contractor is building on Curtis Island, offshore Queensland.

Module construction milestone for Bechtel

The modules for the Queensland Curtis LNG (BG Group), Santos GLNG (Santos, PETRONAS, Total and KOGAS) and the Australia Pacific LNG (ConocoPhilips, Origin Energy and Sinopec), were designed and built by...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry