AUSTRALIA

AED on cyclone watch

THE Puffin oil projects floating processing, storage and offtake vessel, Front Puffin, is on cyc...

AED on cyclone watch

“There is a developing tropical low for coastal areas from Pardoo to Kalumburu,” the company said.

“As standard operating procedure, the FPSO has stopped production. Should a cyclone develop, as it is expected to, the FPSO will disconnect from its mooring and travel to calmer waters.

“During this time the crew remain onboard. Maintenance and other works can be conducted during this period.”

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry