ASIA

Load frame solves weighty problem

A LOGISTICS specialist has developed a special loading frame that provided a timely, cost-effective solution for a customer moving 30 tonnes of oil and gas equipment aboard its IL-76TD-90VD from Johor Bahru, Malaysia to Yuzhno-Sakhalinsk, Russia.

Load frame solves weighty problem

The oil and gas shipment consisted of five pieces, including 13m pipes weighing 18 tonnes. Normally loading such cargo would require the use of 6t of special loading equipment. However, at the time...

Start a free trial to continue reading this article

Already have an account?

Subscribe now
MORE ON THIS TOPIC

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry